A 240-volt, single phase fused disconnect that feeds a motor is being tested. Meter readings indicate: Line side A to line side B - 240 volts; Line side A to load side B - 240 volts; Line side B to load side A - 0 volts; Load side A to ground - 120 volts; Load side B to ground - 120 volts. With 100% certainty, what is the state of both fuses?

Prepare for the Independent Electrical Contractors (IEC) Year 4 Exam. Access flashcards, multiple choice questions, and detailed explanations. Enhance your readiness and achieve your certification!

Multiple Choice

A 240-volt, single phase fused disconnect that feeds a motor is being tested. Meter readings indicate: Line side A to line side B - 240 volts; Line side A to load side B - 240 volts; Line side B to load side A - 0 volts; Load side A to ground - 120 volts; Load side B to ground - 120 volts. With 100% certainty, what is the state of both fuses?