In boiler installations, the copper conductor used between the disconnect and the boiler must be sized using THHN/THWN insulation. Which gauge satisfies the minimum sizing for an 8.2 kW, 240 V, 1-phase boiler?

Prepare for the Independent Electrical Contractors (IEC) Year 4 Exam. Access flashcards, multiple choice questions, and detailed explanations. Enhance your readiness and achieve your certification!

Multiple Choice

In boiler installations, the copper conductor used between the disconnect and the boiler must be sized using THHN/THWN insulation. Which gauge satisfies the minimum sizing for an 8.2 kW, 240 V, 1-phase boiler?